A rebrand with a new website usually takes six to ten weeks from the first workshop to launch, and a new website on its own three to six weeks. Designing and building a website is now the quick part: with AI speeding up the build, it can take days rather than weeks. Most of the time goes on decisions, feedback and content, so how quickly those happen sets the timeline.
Typical timings
These are our usual timings, from the start of the project to launch. They assume feedback within a few days at each stage.
| Project | Typical time | What it covers |
|---|---|---|
| Logo design | One to two weeks | Concepts, two rounds of refinement and final files |
| Kickstart Website | About a week | A one-page website for a new or small business |
| Kickstart Brand and Website | Two to three weeks | A logo, mini brand guide and a website of up to five pages |
| Brand Identity | Three to five weeks | Strategy, identity, guidelines and examples in use |
| New website | Three to six weeks | Site plan, design, WordPress build and launch |
| Brand Therapy (brand and website) | Six to ten weeks | Strategy, identity, website and roll-out documents |
The design and build within those timings is much faster than it used to be. We use AI to speed up page structure, first drafts and the build, and experienced designers make every decision. Most of the remaining time is spent on the parts that need you: agreeing what the brand should say, choosing a direction and signing off content.
Heartlands Group, a children’s care home provider, is a good example of a full project: a careful brand refresh and a new website, planned around the local authorities it works with.






The stages of a project
Most rebrand and website projects follow the same order. Each stage needs your sign-off before the next one starts, which is what stops work being redone later.
- Discovery. A workshop about your business, your buyers and your competitors. We agree what the brand needs to say and who it is for.
- Brand identity. Logo, colours, typefaces and the visual style, shown on your real materials so you can judge them properly.
- Website plan. The pages you need, what goes on each and how visitors get from arriving to getting in touch. No design until the plan is agreed.
- Website design and build. We design the key pages, then build the site in WordPress. You get a round of feedback on the built site before launch.
- Launch and roll-out. Testing on different devices, analytics and SEO settings, then launch. Documents, signage and vehicles follow in the order you need them.
What changes the timeline
- The size of the website. A focused site with a few core pages is quicker than one with many services, sectors or locations.
- Whether the copy is ready. Waiting for content is the most common cause of delay. If you are writing it yourself, start early. Our guide to writing your own copy or hiring a professional helps you decide.
- How many people give feedback. One or two decision-makers keep things moving. A committee adds time at every stage.
- Other suppliers. Photographers, copywriters and developers for special features each have their own schedules.
- Fixed dates. A trade show or contract start can be met, but tell us at the start so the plan is built around it.
How to keep a project moving
- Decide who signs off each stage before the project starts.
- Gather photos, team details, case studies and testimonials early, even in rough form.
- Book time in your diary for feedback, so replies come within a few days.
- Agree what has to be ready at launch and what can follow afterwards.
If you need something sooner, we can reduce what goes in the first phase and add the rest later. For a new or small business that needs to be online quickly, Kickstart is designed for speed. For larger projects, see Brand Therapy, and for costs, How much does a rebrand cost in the UK?
Common questions
Can a rebrand be done in a few weeks?
A logo or a Kickstart project can. A full rebrand with a website needs time for strategy, sign-off at each stage and the website build. Projects that promise this in days usually skip the thinking that makes the brand work.
Can we do the brand now and the website later?
Yes. We can complete the brand identity, then start the website when it suits your budget or timing. Plan the website soon after, so the old site does not sit alongside the new brand for long.
What happens if we need to pause?
We can pause between stages. Pausing in the middle of a stage is harder, because the team loses momentum, so we will agree a sensible stopping point with you.